Galveston Bay LNG’s Open House

When:
January 17, 2019 @ 5:00 pm – 7:00 pm
2019-01-17T17:00:00-06:00
2019-01-17T19:00:00-06:00
Where:
Nessler Center
2010 5th Ave N
Texas City, TX 77590
USA
Contact:
Ashley Helmer
(281) 249-5453

Galveston Bay LNG LogoGalveston Bay LNG proposes to construct a natural gas liquefaction facility and liquefied natural gas (LNG) export terminal in Galveston County, Texas, along the southwest embankment of the Texas City Ship Channel. In concert with the terminal, an associated pipeline system within the State of Texas with multiple interconnects from the Katy Hub to the terminal site, will also be proposed. GBLNG hopes that you will attend one or both of their two Open Houses being planned in areas covering the Terminal and full length of the Pipeline:

  • Jan. 16, 2019, from 5-7 p.m. 
    @ Rosenberg Civic and Convention Center
    (3825 Highway 36 South, Rosenberg, TX, 77471)
  • Jan. 17, 2019, from 5-7 p.m. 
    @ Nessler Center
    (2010 5th Avenue North, Texas City, TX 77590)