Double Lake Work Party
Event category:Â General [1]Trail:Â Double Lake Recreation Area [2]Sunday, July 1, 2012 – 8:00am Meet at the Double Lake Trailhead Parking Area at 8am. We’ll work on the last section of the old trail – Homestretch – to get it dialed back in after the logging. Bring loppers and small hand saws. I have fire rakes (McLeods) for regrooming the tread where the Bobcat-dozer did evil things to the trail.
If you can’t make it early, come by a bit later and help out. We’ll quit working 10:30 – 11ish depending on how hot it’s supposed to get.
The combination of riders’ wheels and folks clearing the trails of the built up debris now have most of the new trails in okay shape. The west side of the old trail has been regroomed except for one short section. There’s also a couple of trees down on the first section of singletrack inside the rec area. I may get to those before Sunday.
Jim Mackey DL Trail Steward
[1] http://ghorba.org/events/general [2] http://ghorba.org/trails/double-lake-recreation-area